Project Overview
Transformation of an existing industrial warehouse into a fully compliant Class D pharmaceutical production facility. As the turnkey main contractor, our scope encompassed the complete lifecycle: engineering design, procurement, civil construction, MEP installation, cleanroom fit-out, and final validation.
Technical Scope of Work
Cleanroom Architecture: Installation of modular sandwich panels (wall & ceiling), flush doors, view panels, and self-leveling anti-static epoxy flooring.
HVAC & MEP Systems: Design and installation of specialized AHU systems with HEPA filtration, precise differential pressure cascading, and strict temperature/humidity controls optimized for extraction processes.
Civil & Finishes: Structural reinforcement of the existing warehouse shell, utility routing, and high-durability architectural finishes.
Commissioning & Validation: Full IQ/OQ protocol execution, including airborne particle count testing, smoke logging, and recovery testing to verify Class D compliance.
Project Performance & Results
Timeline: Successfully handed over ahead of schedule.
Safety: Achieved 100% zero-accident safety record throughout the construction lifecycle.
Compliance: 100% pass rate on all contractual KPIs and WHO GMP validation parameters upon first testing.